Champion Tanker at Shekou
28th Sep 2008 Sun 0500hrs – 1500hrs Attend to Vessel at Singapore anchorage. Inspection of Inert gas’s cooling tower Found that Inert gas’s cooling tower is impossible to remove vertically from the top, because the Nitrogen generator room was located right above to it. Some measurements made, we recommend removing the wall at the exit…
